FRP Lamination for Concrete Swimming Pools

FRP lamination lines concrete swimming pools with one seamless, waterproof layer of GP resin and glass mat, finished with a waxed topcoat. Laid on site; the lining needs no maintenance as long as it holds water.

SKU :

LAM-POOL

Quantity :

FRP Lamination for Concrete Swimming Pools

FRP lamination for swimming pools is a seamless fiberglass lining of general purpose polyester (GP) resin and glass mat laid by hand inside a concrete pool to keep the water in. The mat follows the shape of the pool, bridges small cracks and leaves no joints for water to creep behind. Mui Fatt lines pools on site, and a pool lining needs no maintenance as long as it holds water.

Ringkasan: Lapisan fiberglass (FRP) untuk kolam renang konkrit. Resin GP dan tikar gentian kaca membentuk satu lapisan kalis air tanpa sambungan. Kerja dibuat di tapak, dan lapisan tidak memerlukan penyelenggaraan selagi ia menakung air. Kolam boleh diisi 48 jam selepas topcoat.

Specifications

Substrate Concrete swimming pools
Lining build-up 1 coat of resin primer; plies of 450 g/m² E-glass chopped strand mat (CSM); 1 ply of surface veil; 1 coat of waxed resin topcoat
Number of plies Minimum 1 ply recommended; usually up to 3 plies
Lining thickness About 1 mm per ply, so usually about 1 mm to 3 mm
Resin General purpose polyester (GP)
Colour Natural resin colour (clear) or grey
Typical properties Tensile strength 9,000 psi; tensile modulus 1,000,000 psi; Barcol hardness above 30; adhesion above 290 psi on sweep-blasted concrete
Curing Primer tacky in about 1 to 2 hours; each laminate stage touch dry in about 3 to 4 hours; topcoat left about 12 hours
Back in service We recommend waiting 48 hours after the topcoat before filling
Inspection Visual inspection for blisters, cracks, trapped air and irregularities; ply count during lamination
Work site On site

How we line a pool

  • Site visit: our technical staff check the area, and access for workers, before work starts.
  • Surface preparation: the concrete is blasted to remove laitance and loose material, and dust is vacuumed off.
  • Priming: one coat of resin primer by brush or roller, left about 1 to 2 hours until tacky.
  • Levelling: small holes and unevenness are filled with FRP putty. Large concrete defects must be repaired by the owner first.
  • Lamination: each ply of glass mat is laid into wet resin, wetted through and rolled to remove trapped air, then the surface veil.
  • Topcoat: a resin-rich waxed topcoat, left to cure about 12 hours.
  • Inspection: visual inspection for blisters, cracks and trapped air, with the plies counted as they are laid.

Site conditions we need

  • New concrete: cured for about 28 days before lining.
  • Dry pool: the pool is emptied and dry, and any groundwater leaking in is stopped first.
  • Weather: 10°C to 50°C, relative humidity below 90%, surface at least 3 K above dew point, and no work in rain.

Other FRP lamination pages

Questions About Pool Lamination

How soon can we fill the pool?

We recommend waiting 48 hours after the topcoat before filling.

Does the lining need maintenance?

No. A concrete swimming pool lining needs no maintenance as long as it holds water.

Can you reline an old fiberglass pool?

Yes. We repair and reline old FRP linings. Send us photos and the pool size for a quotation.

Berapa harga lapisan fiberglass kolam renang konkrit?

Hubungi kami untuk harga terkini. Harga bergantung pada keluasan permukaan, bilangan lapis dan jenis resin.

Contact Mui Fatt for a quotation: Get a Quote →

Related Products

Looking For Reliable Fibreglass
Or Polyethylene Products?

Talk to our team today. We’ll help you find the right solution for your business needs.

Get a Quote
CTA Background