The Art of Fiberglass & Polyethylene, Engineered with Innovation and Precision for Lasting Performance.

MST Small Sewage Treatment System Rental 40 to 150 PE

Rent an MST FRP small sewage treatment system (40 to 150 PE) for temporary sites and works, such as site offices, worker quarters and short-term projects, when buying a system is not worth it.

SKU :

MST-RENT

Quantity :
PDF download :
MST Small Sewage Treatment System Rental 40 to 150 PE Download PDF

MST Small Sewage Treatment System Rental, 40 to 150 PE

Mui Fatt rents out MST small sewage treatment systems (SSTS) from 40 to 150 PE (population equivalent) for temporary works. It suits site offices, worker quarters and short-term projects where buying a system does not make sense. The MST is a single horizontal FRP (fibreglass) tank that treats domestic sewage by upflow activated sludge to Modified Standard B effluent. It is SIRIM certified, and Mui Fatt is registered with SPAN.

Ringkasan: Sewa sistem rawatan kumbahan kecil MST 40 hingga 150 PE untuk tapak dan kerja sementara. Tangki FRP diperakui SIRIM, berdaftar dengan SPAN.

Rental Details

Models MST-40 to MST-150 (40 to 150 PE)
Use Temporary sites and works, domestic sewage only
Tank One horizontal FRP tank, 2,400 mm wide, 2,650 mm high; length depends on the model
Process Upflow activated sludge (anaerobic settling, then aerobic treatment with diffused air)
Effluent Modified Standard B
Rental terms On request, based on model and rental period

How to Rent

  • Work out your PE (a house is 5 PE, a worker 0.3 PE, an office 0.03 PE per m²) or use the PE sizing guide →.
  • Tell us the model, the site location and the rental period.
  • The contractor prepares the base, blowers, control panel and site works.

Models

MST-40 → | MST-50 → | MST-60 → | MST-70 → | MST-80 → | MST-90 → | MST-100 → | MST-120 → | MST-140 → | MST-150 →

Frequently Asked Questions

Which models can I rent?

MST models from 40 to 150 PE are offered for rental for temporary works.

What are the rental terms?

Terms depend on the model and the project period. Contact Mui Fatt with your PE and how long you need the system.

Who provides the air blowers and civil works?

As with a purchased MST, the contractor provides the base slab, the air blowers (1 duty, 1 standby), the control panel and the site works.

Related

FRP small sewage treatment systems 40 to 150 PE → | PE sizing guide → | Bio-Filter septic tanks 6 to 30 PE →

Get a Quote →

Related Products

Looking For Reliable Fibreglass
Or Polyethylene Products?

Talk to our team today. We’ll help you find the right solution for your business needs.

Get a Quote
CTA Background
WhatsApp
TikTok
Facebook
LinkedIn